Our projects

Take a look at some selected GEOptimize case studies and see how 70%-80% of energy delivered to a building can be cost-effective and renewable.

Obama-Presidential-Center-01
Chicago, Illinois
2020
GEOptimize worked with the design team to develop an accurate...
CMU
Winnipeg, Manitoba
2023
GEOptimize has been directly involved in the design and implementation...
Water_Tower_Main_Photo
Winnipeg, Manitoba
2025
GEOptimize completed a feasibility study in 2025 for a large-scale...
Troy 1
Troy, New York
2025
GEOptimize Inc provided district energy system modeling for the Troy...
CA MB Ft Whyte Buffalo Crossing 2
Nature Centre
Winnipeg, Manitoba
2022
GEOptimize Inc provided ground heat exchanger (GHX) design and geoexchange...
Poughkeepsie 2
Poughkeepsie, New York
2025
GEOptimize Inc was retained by Labella Associates to complete the...
Steamboat 1
Multi-Family
Albany, New York
2024
GEOptimize Inc provided the GHX system design and whole-building energy...
Cooper Hospital
Hospital
Camden, New Jersey
2025
GEOptimize Inc provided ground heat exchanger (GHX) system design services...
Ithaca 2
Ithaca, New York
2024
GEOptimize Inc was retained by Labella Associates to complete the...
Orrion Farms 1
Large Residential
Scottsdale, Arizona
2024
GEOptimize Inc was engaged to review, optimize, and support the...
Port Hawkesbury 1
Nova Scotia
2024
GEOptimize’s principal contributed to the design of an integrated geothermal...
Missoula Montana 2
Missoula, Montana
2023
GEOptimize completed a district GSHP feasibility study in 2023 for...
County of Inverness Arena
Inverness, Nova Scotia
2022
The feasibility assessment included detailed building energy modeling, subsurface characterization,...
Saranac Lofts 1
Saranac Lake, New York
2022
GEOptimize Inc was retained by Gilson Engineering Associates to develop...
United Church 4
Winnipeg, Manitoba
2022
GEOptimize Inc was retained by the United Church on Meadowood...
BSU 1
Bemidji, Minnesota
2021
GEOptimize completed a district GSHP feasibility study in 2021 for...
Nome Schoolhouse 3
Nome, North Dakota
2021
The existing schoolhouse in Nome was constructed in 1916. In...
Ararat Prison 3
Ararat, Australia
2018
GEOptimize Inc provided the GHX and district geothermal system design...
Spy Apple Cider Distrillery
Thornbury, Ontario
2017
GEOptimize Inc. provided the geothermal system design for the proposed...
Waterfront 1
Toronto, Ontario
2017
GEOptimize Inc, in partnership with Demand Side Energy Consultants, completed...
Perham-High-School 1
Perham, Minnesota
2016
GEOptimize Inc was retained by Ottertail Power Company to develop...
Ikea 3
Centennial, Colorado
2011
GEOptimize’s principal led the geothermal and integrated energy system design...
IKEA
This facility in Centennial, CO became the first IKEA store in North America to take advantage of a geothermal system. Integration of ice storage with the geothermal system reduced electrical demand by approximately 30%.
Prairie Dale Middle School
With innovating drilling processes, GEOptimize ensured that a geothermal system was safely installed at Prairie Dale Middle School, despite its location above the local town’s drinking water aquifer. This is a test
Obama Presidential Library
GEOptimize was asked to provide review and design assistance for the mechanical engineering (Altieri Engineering) and geotechnical engineering (P.W. Grosser) design firms for the proposed 280,000 square foot (26,000 m2) presidential library.
555 Greenwich
GEOptimize was commissioned to design a GHX to take advantage of foundation piles for a 17-story office building in Manhattan. Integration of water-to-water heat pumps with air source heat pumps provide 100% of the heating and cooling for the building.

Our Projects

Take a look at some selected GEOptimize case studies and see how 70%-80% of energy delivered to a building can be cost-effective and renewable.