Our Projects

Take a look at some selected GEOptimize case studies and see how 70%-80% of energy delivered to a building can be cost-effective and renewable.

Ikea Office
Hamilton, Ontario
2025
GEOptimize provided the detailed design of a ground source heat...
Obama-Presidential-Center-01
Chicago, Illinois
2020
GEOptimize worked with the design team to develop an accurate...
CMU
Winnipeg, Manitoba
2023
GEOptimize has been directly involved in the design and implementation...
Water_Tower_Main_Photo
Winnipeg, Manitoba
2025
GEOptimize completed a feasibility study in 2025 for a large-scale...
555 Greenwich
New York, New York
2022
GEOptimize provided engineering support while working with Endurant Energy, who...
Troy 1
Troy, New York
2025
GEOptimize Inc provided district energy system modeling for the Troy...
CA MB Ft Whyte Buffalo Crossing 2
Nature Centre
Winnipeg, Manitoba
2022
GEOptimize Inc provided ground heat exchanger (GHX) design and geoexchange...
Poughkeepsie 2
Poughkeepsie, New York
2025
GEOptimize Inc was retained by Labella Associates to complete the...
Steamboat 1
Multi-Family
Albany, New York
2024
GEOptimize Inc provided the GHX system design and whole-building energy...
Cooper Hospital
Hospital
Camden, New Jersey
2025
GEOptimize Inc provided ground heat exchanger (GHX) system design services...
Ithaca 2
Ithaca, New York
2024
GEOptimize Inc was retained by Labella Associates to complete the...
Orrion Farms 1
Large Residential
Scottsdale, Arizona
2024
GEOptimize Inc was engaged to review, optimize, and support the...
Port Hawkesbury 1
Nova Scotia
2024
GEOptimize’s principal contributed to the design of an integrated geothermal...
Missoula Montana 2
Missoula, Montana
2023
GEOptimize completed a district GSHP feasibility study in 2023 for...
County of Inverness Arena
Inverness, Nova Scotia
2022
The feasibility assessment included detailed building energy modeling, subsurface characterization,...
Saranac Lofts 1
Saranac Lake, New York
2022
GEOptimize Inc was retained by Gilson Engineering Associates to develop...
United Church 4
Winnipeg, Manitoba
2022
GEOptimize Inc was retained by the United Church on Meadowood...
BSU 1
Bemidji, Minnesota
2021
GEOptimize completed a district GSHP feasibility study in 2021 for...
Nome Schoolhouse 3
Nome, North Dakota
2021
The existing schoolhouse in Nome was constructed in 1916. In...
Ararat Prison 3
Ararat, Australia
2018
GEOptimize Inc provided the GHX and district geothermal system design...
Spy Apple Cider Distrillery
Thornbury, Ontario
2017
GEOptimize Inc. provided the geothermal system design for the proposed...
Waterfront 1
Toronto, Ontario
2017
GEOptimize Inc, in partnership with Demand Side Energy Consultants, completed...
Perham-High-School 1
Perham, Minnesota
2016
GEOptimize Inc was retained by Ottertail Power Company to develop...
Ikea 3
Centennial, Colorado
2011
GEOptimize’s principal led the geothermal and integrated energy system design...