IKEA Distribution Centre

GEOptimize provided the detailed design of a ground source heat pump system serving a 30,000 ft² office area within the 900,000 ft² IKEA Distribution Centre in Hamilton, Ontario.
555 Greenwich Street

GEOptimize provided engineering support while working with Endurant Energy, who was responsible for the procurement and construction of the all-electric hybrid heat pump system for Hines’ commercial office development at 555 Greenwich Street in Manhattan.